Solar Lighting Designs will be closed over the holiday break 23rd Dec - 12th Jan

Lutanda Manor Solar Bollard Lighting Installation – Stage 3

Projects

Solar
Lighting
Designs

Solar Lighting Designs

©2024

Project Details

Project Information

Projects

Solar
Lighting
Designs

Solar Lighting Designs

©2024

Project Details

Team

SLD

Location

NSW

Client

Lutanda Manor

Job

Team

SLD

Location

NSW

Client

Lutanda Manor

Job

Blog Information

Client Brief

For Stage 3 of the Lutanda Manor development, the client required solar bollard light installation that would ensure safe access. The 45 metre path, was densely covered with vegetation limiting the available sunlight for standard solar lighting.

Assessment

Due to the limited sun exposure in the pathway area, our standard Orion Premium White solar bollards were not viable. To overcome the shading challenges, we proposed five Orion Premium White Bollards connected to a remotely located 80W solar panel installed in a nearby open area with sun exposure. The bollards were spaced along the pathway and connected through hidden cabling to the solar panel, which powered the system. 

Outcome

SLD supplied and delivered solar bollard light installation. The solar system was efficient and effective, despite the environmental challenges. The Lutanda Manor Stage 3 lighting solution is a strong example of SLD’s ability to adapt standard products to meet unique site conditions.